    • Client is a leading producer of cement and has a pan India Presence
    • It has several integrated manufacturing units and 3 grinding units spread across India
    • In the plants, asset utilization was very low, and machines were undergoing frequent breakdowns
    • Cost of operations was also very high (variable costs)
    • Leadership was struggling with a culture of slow response to the change

    Our Approach

    Major Producer of Brake Hoses

    Benefits delivered

    • Improve 4 plants run factor from 315 days to 340 days
    • Reduction of Plant breakdowns by 40%
    • Reduce shutdown time reduction from 20 days to 14 days
    • Specific  Power consumption reduction by 2-3%